Custom  Manufacturers & Suppliers Made Mechanical Parts CNC Machining Parts Machinery Aluminum Parts

Our primary items are Needle Roller bearings, Cylindrical Roller Bearings, Rod finish Bearings, Spherical simple bearings, Monitor roller Bearings for Guideway, Roller Bearings, Blend Bearings for forklifts, Drinking water Pump Bearings, SNR Auto Bearings and all sorts of Spherical Bearings.

Resources

1. metal:Aluminum/Metal/Alloy steel/Stainless steel/Brass,copper,bronze and many others.

2. plastic: Stomach muscles,POM,PE,PP,PVC,Computer,PMMA,Teflon,nylon and so forth.

3. other folks: carbon fiber, glass,fiberglass, wooden, tough rubber etc.

Coloration

Silver, Gray, Black ,Gold or as client’s necessity

Surface area Roughness

Ra0.eight ( without sprucing or grinding)

Brand Method

laser engraving, CNC engraving, display-printing and many others.

Floor Finish 

Anodize polishing zinc/nickel/chrome/gold plating, sand blasting, ect.

Tolerance 

+/- .01–.05mm / can also be personalized

Certification

ISO9001:2015

Processing equipments

CNC machining centre,NC lathe, Grinding equipment, Automated lathe device, Traditional lathe device,Milling equipment,Drilling equipment,EDM,Wire-reducing equipment,CNC bending equipment and so on

Testing equipment

Coordinate measuring machine,Impression measuring instrument,Caliper etc

Software

Health-related Devices/Electronic/ Industrial// Automation / motorEPG is prepared to cooperate sincerely and develop frequently with pals!cycle/3D printer

Support

OEM,ODM or as client’s requirement

 

Trade Terms FOB, CIF, EXW
MOQ 1Pcs
Port xiamen, or as client’s prerequisite
Shipping By air  (DHL,UPS,Fedex,EMS and many others.),By Sea,Express…
Payment Approach T/T(bank transfer),L/C,paypal,western union, moneygram,escrow, income and so on
Payment Conditions fifty% before production, 50% ahead of delivery
Packing interior box,numerous bins/learn carton or as customer’s necessity
Shipping and delivery time  5-7days for Alanple time,five-25 days for production

Packaging & Delivery
Packaging Specifics
1. inner packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and so forth. 
two. outer packaging: carton box, wood situation, plate and so forth. 
three. as for each customers’ requirement
Port
xiamen, or as client’s need
Lead Time :

Quantity(Parts) 1 – 20 21 – 100 one hundred and one – 1000 >1000
Est. Time(times) 5 10 25 To be negotiated

If you will find everything I can aid, make sure you come to feel cost-free to speak to with me
  Telephone: 15359322298